Jo got in touch as she needed some help with redesigning their school playground. The school needed some new equipment for the children to play on and also needed some of the old equipment removing and some wetpour repairs undertaking. Julian met with Jo at the school and undertook a site survey and discussed the schools requirements in more detail. The SLT at the team were very impressed as we were able to undertake all the work for the school. They had struggled to find a playground installer who would remove the existing equipment and also undertake some wetpour edge repairs for them. At Morti Sport and Play we offer a turnkey solution for our clients and project manage the process all the way through, taking the pressure away from the SLT team at the school. We know how busy being a teacher is and we deliver our projects smoothly and efficiently meaning that the school had one less thing to worry about!
We always undertake a detailed CAD plan prior to any installation. These typically show the products being installed alongside dimensions and any surfacing that may be required.
The school were delighted with their new playground and the children at the school are enjoying playing on their new equipment too! We're looking forward to working together again in the future.